Project management & fabrication software

One thread from material request to final weld.

EPC Thread connects project controls, engineering, procurement, material receiving and fabrication QC, so every team works from the same project data.

17Integrated work areas
6Linked stages, from MR to fabrication
5Role-based access levels
4NDT methods tracked per joint: RT, UT, MT, PT
Product tour

See it working

These are real EPC Thread screens, shown with a fictional sample project. Click any screen to enlarge it.

S-curves

Move through the project week by week

Drag the status week to see plan, actual and variance change. EPC Thread calculates the same view from your measurement table or imports it from your weekly workbook.

Status week02 Nov 2026
Planned85.6%
Actual89.2%
Variance+3.6%

Interactive sample data.

PlannedActual
Cost control

Every line tied back to its PO

Budget, forecast and actual build up from the cost groups and the purchase orders linked to them, so the report stays current as orders are placed.

  • Budget, forecast, actual and difference by line
  • Variation order cost shown in its own column
  • PDF and Excel reports, plus a read-only report for managers
Cost reportSample project, USD
Material
Services
Subcontract
BudgetForecastActual
Budget695,500
Committed603,050
Remaining92,450
The line-by-line cost report
Monthly and cumulative cashflow
Document register

Know what is issued, late or waiting on the client

Track contractor and customer numbers, revisions, planned and actual dates and approval status for every deliverable.

16Documents
9Approved
2In review
2Late issue
  • Import your register from Excel
  • Issue transmittals and dispatches from selected documents
  • Attach the files exchanged on each revision
The thread

Follow every item through the project

The stages are linked, so a line item can be traced from request to the shop floor.

Material Request

Raised from an Excel upload, by hand, or from a BOM extractor.

Purchase Request

Created from MR items, including split quantities.

Purchase Order

Vendor, value and budget category commit the cost.

Delivery

Expected dates are tracked and overdue items flagged.

Receiving & QC

Stores inspection, RFI, QC inspection and RIR release.

Fabrication

Issued material is tracked through welding and inspection.

Fabrication quality

Shop-floor records that stand up to inspection

Fabrication and QC enter their own data on the same joints. The rules are applied on the server, so results and welding records stay in the right hands and the right order.

  • Fabrication owns fit-up and weld logs; QC owns results
  • QC results are accepted only after a joint is welded
  • Weld logs lock once QC has recorded a result
  • Welder performance and repair rates across equipment

See EPC Thread on a project like yours

Tell us how your projects run and we will walk you through the system.

Request a demo

Fictional sample project.